Friday, June 19, 2009

Week 6...final week in urea/offsite section

my urea/offsite supervisor..Mr Hafiz, Executive Engineer in Urea/Offsite section.

this is my training supervisor, Mr Igat Das, Electrical Executive Trainer. very friendly people, both of the executives.


Azman n Ng Che Wei...nice guys.. tho che wei teases me alot.. owh on last friday, che wei n I went to the shipping substation along with Mr Azhar, Mr Hafiz n Mr Adri.. the executives went by pickup along with a vendor n me & che wei went using bicycle. I havent been riding a bike for quite sometime now and was not too confident to ride Mr Bahrin's bike bcoz it was quite high (the seat) but it turn out ok, I havent forgot how to use a bicycle after all.haha.and IT WAS ALOT Of fUNNNN TOO!!


while in the hilux. one special thing about working in the urea section is that we have a transport to go here and there. since our job involve the offsite area and carring heavy motors, thus a pickup/hilux is needed for our daily work.. other sections just use bicycle to go around the plant area. every staff has one.


r..while in the workshop. thats En Ghani (Urea/Offsite) & En Razak(workshop section). En Ghani is very generous with his knowledge and a very experienced technician.



inside the BUS (bulk urea storage).. it was like walking on a snow pile. except that the BUS condition is as hot as if we were in an oven ready to be cooked.lol that huge thing is called the reclaimer.


if u can see there is a ladder attached to the reclaimer.. it is used for us to go inside the urea area.. when I went down the ladder and still have 2 more steps to go, I stoopidly decided to skip both and just jump to the urea pile and poor me I lost control when I land on the urea, so I land on my butt haha.. and when Chei Wei (one of the technicians in urea sect, the naughty one) saw me he just laugh, laugh and laugh..and so was I..lol



feroz working on the material collision wire..


joining the Urea section have been so much fun. I'm going to miss everyone in the urea section. but I'm looking forward to join the ammonia/utility sect next week.
and i'm quite nervous for next week coz my lecturer is coming for a visit on wednesday. wish me luck hehe hope that he will not ask me so many questions la..hoho

next week I should be under Ammonia/Utility with Miss fadhila, but currently shes going to the petronas games, so Mr Adri Thauriq will be my supervisor ;)

Sunday, June 14, 2009

Week 5 of my Industrial Training..

I was really looking forward for my week 5 of my industrial training cause this week I'll be working in the urea & offsite section. The last 2 weeks in generation section was great but urea is going to be soooo much fun. why? (u ask) cause this section involve offsite works and that means I'm going to visit the shiploading site at port (outside abf)!!

I was going to take some pictures of the shiploader and the ship that carries the urea to other countries but (huhu) it is not allowed to take photos there. owh well.. maybe next week i'll just quietly snap some with my phone ^_^.

::really excited mode:: OWH, I SHOULD MENTION THAT THE SHIP WAS SOOO HUGE AND WHILE I WAS WALKING UPSTAIRS THE SHIPLOADER I WAS JUST AMAZED TO SEE HOW HUGE THE SHIP WAS AND IT WAS LIKE WALKING ON SNOW (UREA WERE ALL OVER THE SHIPLOADER).. :).. AND THE SHIPLOADER WAS SOO OILY AROUND THE RAIL I WAS AfRAID THAT I WAS GOING TO SLIP :p BUT fEROZ (ONE Of THE TECHNICIANS) ALWAYS MAKE SURE THAT I WENT fIRST BEfORE HIM. PROBABLY HE'D BE ABLE TO CATCH ME If I WAS TO SLIP.. nice guys they r, the technicians. eventho they always tease me :)



last friday we (electrical section) should have had our safety briefing & knowledge sharingin the afternoon but instead everyone in the maintenance area (electrical, instrumentation & mechanical) had to go to the auditorium for API briefing (abf performance improvement).

standing up while singing

and guess what, before the briefing starts we had to sing Petronas official song.lol. I had no idea Petronas have an official song but thank god they put the lyrics in the montage that they play while we sing the song.

on wednesday I had to do Mr Hafiz job which is to lead the morning meeting before we starts our work everyday. Mr Hafiz is the Executive Engineer for Urea/Offsite section and he's one of my supervisors. I had to replace him cause he had to go to kuantan for petronas Electrical forum.
At first, the thought of replacing him was scary for me cause I had no idea how I (a trainee) can lead this team of knowledgeable & experienced technicians!!. but thank God, the technicians and kak fadhila (my other supervisor) helped me alot with the section planned jobs, issues etc.hehe.

On wednesday we did an overhaul job for a motor (during meeting they keep saying "we had to overhaul 28-p002.." .. "the project sect wouldnt shut down 28-p002.." and I was like "what the hell is '28-p002'.." haha.. but ofcourse I didnt say that out loud.. I only found out it was a motor just after we went to the cooling tower near the CCR.. we talk using unit numbers here instead of saying 'motor' lol)

overhaul work.. green coverall = contractor

the urea/offsite team..from the left mr bahrin, che wei, feroz and i forgot the contractor's name.hehe

by now, we still havent put back the motor into the plant area coz the motor seal was damaged and no replacement yet.huhu. we also damaged the cooling fan but they just glued it together lol.

this urea/offsite section is the sect that had the most jobs compare to other sect. and this week we really had trouble with the BUS (Bulk Urea Storage) area coz the tripper car in BUS 1 is not working for some reason and we had to find the culprit. (well actually most of the engineers in electrical think its prob is with the PLC so it really is not our prob, its the instrumen prob hoho).

yippie, mr hafiz will be back next week..